sched/core: helper function for setting the current capacity
Introduce set_capacity_curr() to be able to specify the new capacity
(OPP) at which a cpu (cluster) should switch to run at. Builds on
top of irq_work.
Signed-off-by:
Juri Lelli <juri.lelli@arm.com>
Loading
Please register or sign in to comment